Physical networks that produce, convert, move, store, and deliver energy across fossil, renewable, storage, and electricity systems.

Infrastructure Layer Map

Technology Coverage Matrix

LayerOilGasCoalSolarWindHydroBatteriesPumped HydroHydrogenGrid
Resource InputCoreCoreCoreCoreCoreCoreN/ACoreN/AN/A
Extraction / GenerationCoreCoreCoreCoreCoreCoreN/ASupportingConditionalN/A
Processing / ConversionCoreCoreSupportingLimitedN/AN/AN/AN/ACoreN/A
Transport / TransmissionCoreCoreCoreSupportingSupportingSupportingLimitedN/AConditionalCore
Storage / BufferingCoreCoreCoreConditionalConditionalSupportingCoreCoreCoreSupporting
Import / ExportCoreCoreCoreN/ALimitedLimitedN/AN/AConditionalSupporting
Distribution / DeliveryCoreCoreCoreSupportingSupportingSupportingSupportingN/AConditionalCore
Control & OperationsSupportingSupportingSupportingSupportingSupportingSupportingCoreSupportingConditionalCore

Infrastructure Asset Explorer (12)

Infrastructure Constraints

Physical Capacity

Infrastructure at or near nameplate capacity.

Severity: high
Interconnection Limits

Queue delays for new generation and storage.

Severity: high
Permitting

Regulatory processes delaying development.

Severity: medium
Maintenance

Outages reduce capacity during critical periods.

Severity: medium
Weather Exposure

Extreme weather can disrupt operations.

Severity: variable
Logistics

Rail, truck, barge, and port constraints.

Severity: medium
Equipment Supply

Transformer, turbine, and cable shortages.

Severity: medium
Storage Limits

Depleted buffers reduce system flexibility.

Severity: variable

Storage & Buffering Comparison

Crude Oil Tanks
Capacity:~6 wks demand
Duration:Days-months
Response:Hours
Role:Logistics buffer
Strategic Petroleum Reserve
Capacity:1.8B bbl
Duration:Months
Response:Days
Role:Emergency supply
Underground Gas Storage
Capacity:Trillions cf
Duration:Seasonal
Response:Hours-days
Role:Heating buffer
Coal Stockpiles
Capacity:Weeks-months
Duration:Weeks-months
Response:Days
Role:Power plant buffer
Battery Storage (BESS)
Capacity:GWh typical
Duration:1-4 hrs
Response:ms
Role:Grid balancing
Pumped Hydro
Capacity:Thousands MWh
Duration:6-16 hrs
Response:Minutes
Role:Bulk storage
Hydrogen Storage
Capacity:TWh potential
Duration:Days-seasons
Response:Hours
Role:Seasonal backup
LNG Storage
Capacity:Days-weeks
Duration:Days-weeks
Response:Hours
Role:Regas buffer

Grid & Integration

Generation Step-Up

Transformers step up voltage for efficient transport.

Transmission Backbone

High-voltage lines carry bulk power across regions.

Substations

Nodes for voltage transformation and power flow control.

Distribution Networks

Lower-voltage lines deliver to end users.

Interconnectors

Cross-border links enabling electricity trade.

Control Centers

SCADA and balancing authorities manage the grid.

Grid-Scale Batteries

Fast frequency response and renewable smoothing.

Demand Response

Programs adjusting consumption to grid conditions.

Resilience & Vulnerability

RedundancyLow Concern
Multiple alternatives
Single-point dependency
Spare CapacityLow Concern
Ample unused capacity
Sustained high utilization
Storage BufferLow Concern
Adequate reserve duration
Low storage with limited refill
Repair TimeLow Concern
Short repair cycle
Long repair, supply-chain dependency
Weather ExposureLow Concern
Low climate exposure
High exposure, limited mitigation
Data ConfidenceLow Concern
Recent, source-backed
Sparse or unavailable data

Scores are illustrative. Each dimension should be backed by documented data sources and methodology notes.

Scenario Stress View

Illustrative scenarios showing how infrastructure stress moves through the physical system. Not a forecast.